It has a radial seal air filter with pre-filter, and large fuel pre-filter which prolongs engine life. A fuel filling pump and pressure transmitter are included for higher fuel economy.
The high quality hydraulic parts are stable, reliable, efficient and strong.
It has newly designed cab, seats, interior and air-conditioning system with automatic adjustment function for comfortable operation.
There is a new generation electric control system with large color display capable of real-time monitoring of machine operations, self-diagnosis and recording, plus an electric throttle and multiple work modes.
The enhanced excavator and undercarriage, and heavy duty chassis are ideal for tough work conditions.
Multiple bucket styles and optional parts like dozer blades, breakers, scarifiers, electromagnetic suction cups, quick couplers etc. are available for digging, landfill, breaking, and grading operations.
The multifunctional GPS allows for remote control and data transfer so real time machine conditions can be monitored.
This model features an extra large tool case and fuel tank, and centralized electric equipment.
Also standard equipment on the 933D are a box-type frame side member, wide track gauge, and long ground length with 600mm heavy track.
Standard Equipment | |
---|---|
FOB Price Range - $184,000 - $190,000 / unit | Bucket Capacity - 1.4 (m3) |
Delivery to any port | Bucket Width - 1372mm |
ENGINE | SWING SYSTEM |
Model - Cummins 6C8.3 (Tier2) | Swing Speed - 11.5r/min |
Type - Water cooling, 6-cylinder, in line, turbocharging | Brake - Pressure released mechanical braking |
No. of cylinder. Bore and stroke (mm) - 6 X 102 X 120 | TRAVEL SYSTEM |
Displacement (L) - 5.9 | Travel motors - Variable axial piston motor |
Power output - 186KW/2000rpm | Travel shoes - 2 X 48 |
Travel speed (km/h) - 2.95/5.05 | |
HYDRAULIC SYSTEM | Drawbar pulling force (KN) - 284 |
Hydraulic pump form - Variable double-piston pump | Gradeability - 70% (35°) |
Rated flow (L/min) - 2 X 265 | Support roller quantities - 2 X 9 |
Travel circuit (Mpa) - 31.9 | Carrier roller quantities - 2 X 2 |
Swing circuit (Mpa) - 25.5 | |
Control circuit (Mpa) - 3.9 | LUBRICATION |
Fuel tank (L) - 600 | |
DIGGING FORCE | Cooling System (L) - 25.5 |
Bucket Digging Force - 168.1KN | Engine Oil (L) - 20 |
Arm Digging Force - 142.8KN | |
OPERATING WEIGHT & GROUND PRESSURE | |
BUCKET | Operating Weight - 32900Kg |
Harga :
Kredit :
Posting Komentar